Suez Canal Transit Services Egypt

  • Home
  • Suez Canal Transit Services Egypt

Suez Canal Transit Services Egypt

SCA Agent & Convoy Planning — Port Said to Suez, 24/7

Suez Canal Transit Services Egypt from Marine Trust cover pre-arrival planning, SCA documentation, SCNT-based toll calculation, convoy assignment, and vessel support throughout the passage. A missed convoy deadline or incomplete SCA package can cost tens of thousands in late surcharges. Transit is operated alongside our port agency services in Egypt by the same operations team.

29 Years ExperienceDirect SCA RelationshipsSCNT Toll Calculation24/7 Operations
Suez Canal Transit Services Egypt
Suez Canal Agent Egypt

Why Use Marine Trust for Suez Canal Transit

Whether northbound from Suez or southbound through Port Said, Marine Trust provides accurate cost forecasting, correct documentation, and operational judgment from genuine Egyptian maritime management — not arm’s-length commercial representation.

29

Years Maritime Experience

Egyptian maritime operations behind every transit PDA.

24/7

Operations Support

Direct access throughout Port Said to Suez passage.

SCA

Direct Relationships

Pre-clearance and documentation handled at source.

All

Vessel Classes

N1, N2, and northbound Group A & B assignments.

01

24/7 Operations Support

Every transit monitored from Port Said to Suez. Convoy updates, documentation queries, and emergency response — canal hours are not office hours.

02

Accurate SCNT Toll Calculation

SCNT differs from international gross tonnage. Errors create unexpected charges. We calculate precisely and prepare a PDA before the vessel commits.

03

Convoy Scheduling & Classification

N1, N2, and Northbound Group A or B are not interchangeable. We confirm the correct assignment against type, dimensions, draft, and cargo status.

04

Direct SCA Relationships

Built through decades of Egyptian maritime operations — faster pre-clearance, priority documentation, and issues resolved at source during transit.

05

Rebates & Bilateral Agreements

Regular user rebates, bilateral benefits, flag exemptions, and volume discounts identified before the PDA is submitted. Operators without specialist advice routinely pay more than they need to.

06

Port Said to Suez Coverage

Full northbound and southbound management — one team for documentation, tolls, convoy assignment, and vessel support through the passage.

Request a Suez Canal Transit PDA — available 24/7.

Service Scope

Suez Canal Transit Services — What Marine Trust Manages

Full transit management from first notice through final clearance — documentation, tolls, convoy assignment, and vessel support during the passage.

01

Pre-Arrival Planning & SCA Documentation

SCA requires minimum 5-day notice — we recommend 7–10 days. Full vessel particulars (IMO, LOA, beam, draft, GRT, NRT, DWT, SCGT, SCNT), advance notifications, transit applications, and SCA paperwork filed in sequence. Convoy placement, PDA accuracy, and rebate application are decided in this window.

02

SCNT Toll Calculation & PDA Preparation

Detailed Proforma Disbursement Account covering canal dues, pilotage, convoy surcharges, mooring/unmooring, searchlight charges, and agency disbursements. All rebates applied before finalisation. The figure before arrival is the figure you should pay.

03

Convoy Selection & Vessel Classification

Correct convoy confirmed before arrival. Incorrect classification causes delays, surcharges, and schedule disruption. Type, dimensions, draft, cargo status, and SCA restrictions verified against current requirements.

04

Crew & Vessel Services During Transit

Husbandry during passage — crew changes at Port Said, Ismailia (Great Bitter Lake), or Suez; cash to master; spare parts to GBL during N1 stops; emergency technical assistance; bunkers at Port Said or Suez. Tanker terminal calls after transit managed under one appointment via our tanker port agency.

Start transit coordination 7–10 days before arrival for best convoy placement.

Convoy Planning Egypt

Suez Canal Convoy Schedule and Timing

Missing a convoy deadline costs money. The SCA applies automatic late surcharges of 3% to 5%. Marine Trust coordinates arrival timing for every transit to keep the vessel on schedule.

N2 — Second Southbound

Port Said to Suez — Standard

Departure
07:00 – 09:00 hrs daily
Anchorage Deadline
03:00 hrs (same day)
Transit Duration
14 – 16 hours
Route
Ballah By-Pass mooring
Vessel Types
General cargo, bulk carriers, smaller tankers
Restrictions
Ballast over 90,000 SCGRT; Grade A tankers; beam over 145 ft not permitted
Late Surcharges
03:00–04:00 → +3% | 04:00–05:00 → +5%
Northbound — Group A & B

Suez to Port Said — Continuous

Departure
06:00 – 11:30 hrs daily
Transit Duration
12 – 14 hours
Passage
Continuous — no Great Bitter Lake stop
Group A Deadline
01:00 hrs — Containers; loaded VLCCs; LNG/LPG; heavy bulk
Group B Deadline
03:00 hrs — General cargo; smaller tankers; RoRo; other
Late Surcharges
Minor delays → +3% | Significant → +5%

Convoy assignment query — speak with our transit team.

SCNT Canal Dues

Suez Canal Toll Structure and Cost Optimisation

Canal dues are calculated on SCNT — Suez Canal Net Tonnage — a vessel measurement specific to the canal. A typical mid-size container vessel pays approximately USD 300,000–500,000 per transit. Marine Trust prepares a precise PDA tailored to your vessel before arrival.

Primary Toll Variables

  • SCNT — main determinant of basic canal dues
  • Vessel type classification
  • Cargo status: laden vs. ballast
  • Vessel dimensions: beam and draft

Additional Charges

  • Compulsory pilotage (vessels over 300 GT)
  • Searchlight services for night transit
  • Mooring and unmooring fees
  • Late arrival penalties: 3–5%
  • Dangerous cargo surcharges

Available Rebates

  • Regular user rebates
  • Bilateral agreement benefits
  • Special trade route programmes
  • Volume discounts for fleet operators
  • Flag state exemptions
Canal Specifications

Suez Canal Technical Specifications

SpecificationMeasurement
Total Canal Length192 km (119 miles)
Port Said to Ismailia78 km
Ismailia to Suez84 km
Maximum Permissible Draft16.16 metres (53 feet)
Canal Depth19.5 – 20 metres
Width at Water Level300 metres minimum
Navigation Width (Buoys)180 metres
Speed Limits11 – 16 km/h (section dependent)
Compulsory PilotageAll vessels exceeding 300 gross tons
Transit Authority

Marine Trust Credentials — Suez Canal Transit Authority

Our founder holds direct port authority knowledge that most Egyptian transit agents cannot match. This is not background history. It is the reason our PDAs are accurate and our convoy recommendations are definitive.

Capt. Adel Hassan — MD

29 years Egyptian maritime operations, including 13 years as Marine Operations Manager and Head of Pilots at Marsa Al Hamra under EGPC. Ship Master and senior port authority command — both sides of the transit relationship.

Established International Partnership

Active collaboration within EGPC-regulated petroleum operations over more than six years — extending operational reach across Egyptian ports and terminals.

ISO 9001 Certified

Every transit — from pre-arrival notice through final clearance — under a documented, audited quality management framework.

FAQ

Frequently Asked Questions — Suez Canal Transit

How far in advance should I notify Marine Trust of vessel arrival?
The SCA requires a minimum 5-day advance notice. Marine Trust recommends starting 7 to 10 days before arrival — when convoy placement is confirmed, the PDA is prepared accurately, and rebates can be applied. Earlier contact consistently produces better results.
What is the average Suez Canal transit time?
Southbound from Port Said to Suez runs 14 to 16 hours. Northbound from Suez to Port Said runs 12 to 14 hours. Actual time varies by convoy size, speed restrictions, and Great Bitter Lake anchorage for N1 southbound convoys.
How much does Suez Canal transit cost?
A typical mid-size container vessel pays approximately USD 300,000 to 500,000 per transit. The figure depends on SCNT, vessel type, cargo status, dimensions, and applicable rebates. Contact Marine Trust for a precise PDA prepared to your vessel's specifications.
What is SCNT and how does it affect canal dues?
SCNT (Suez Canal Net Tonnage) is the primary measure for calculating transit fees. It is based on usable internal volume under SCA measurement rules and differs from standard international gross tonnage. Marine Trust calculates SCNT precisely for every transit.
Is pilotage compulsory for all vessels transiting the Suez Canal?
Yes. Pilotage is mandatory for all vessels exceeding 300 gross tons. SCA-certified pilots board at Port Said for southbound and at Suez for northbound. Pilotage fees are included in Marine Trust's pre-arrival PDA.
Which convoy should my vessel join — N1 or N2?
N1 is required for VLCCs in ballast with draft over 42 feet, LNG/LPG carriers, loaded tankers, and large container ships. N2 covers general cargo and bulk carriers, with restrictions on ballast vessels over 90,000 SCGRT, Grade A tankers, and beam over 145 feet. Marine Trust provides definitive convoy advisory before arrival.
What are the penalties for missing a convoy deadline?
The SCA applies automatic late surcharges: 3% for minor delays, 5% for significant delays. These charges are not negotiable. Marine Trust's pre-arrival planning and continuous monitoring keep vessels on schedule for their assigned convoy.
Can crew changes be carried out during Suez Canal transit?
Yes — at Port Said before southbound departure, at Ismailia (Great Bitter Lake) during the N1 stop, or at Suez following southbound arrival, subject to Egyptian immigration approvals. Marine Trust coordinates logistics and documentation as part of the transit service.
Does Marine Trust provide port agency services at Port Said and Suez?
Yes. Full port agency at Port Said, Suez, and principal Egyptian terminals including Alexandria, El-Dekheila, and Damietta. Transit integrates with our port agency services in Egypt, vessel husbandry, and customs clearance.
Related Services

Related Egyptian Maritime Services

Suez Canal transit is one stage of a vessel’s Egyptian port call. Marine Trust provides the full range of maritime agency services before, during, and after canal passage — including at Marsa El Hamra.

ServiceCoverage
Port Agency Services in EgyptAll major Egyptian ports — Alexandria, El-Dekheila, Port Said, Damietta, Ain Sukhna, Suez
Ship & Vessel Husbandry ServicesCrew, provisions, spare parts, technical assistance at all Egyptian ports
Marsa El Hamra Port AgencySpecialist offshore petroleum terminal agency under EGPC
Tanker Port Agency for Oil & Gas TerminalsCrude oil, LNG, and LPG tanker operations across Egyptian petroleum terminals

Ready for Suez Canal Transit? Speak with Our Team.

29 Years Egyptian Maritime Operations | Direct SCA Relationships | Accurate SCNT Toll Calculation

24/7: +20 101 691 9166
Email: info@marinetrusteg.com
Office: Smouha, Alexandria